mazowieckie, warszawski zachodni, Kampinos, Komorów
Land for sell
I. Type of investment - farmhouse development.
Investment includes:
a) construction of a two-family residential building,
b) construction of an individual water intake,
c) construction of a non-drain tank for liquid waste with a capacity of up to 1O m3.
Conditions and detailed rules for the development of the site and its development resulting from separate regulations, in terms of:
a) building line - the project site is adjacent to the public road only on the fragment constituting a private internal road with a width of 8.0 m (parcel ev. No. 199/1O), where it is not possible to locate a building, therefore, the building line is not determined - the building line is determined only from the front of the plot adjacent to the public road lane and determines the maximum approximation of the building to the road lane, the specific location of the object within the boundaries of the project site, in accordance with the separate regulations, will take place at the stage of the building permit decision. From the borders of neighboring parcels, from the border of the forest and from the existing oil pipeline, the planned project should be located in accordance with the applicable technical conditions;
b) development area - taking into account the investor's request, the size of the development area in relation to the area of the project site is set at a maximum of 18%, the share of biologically active area - a minimum of 60%;
c) width of the front elevation - taking into account the investor's request, the width of the front elevation for the proposed development is established - from 19.0 m to 21.0 m;
d) height of the upper edge of the front elevation - taking into account the investor's request, the height of the upper edge of the front elevation for the proposed development is established from 7.5 m to 9.5 m,
e) roof geometry - taking into account the investor's request, it is established for the proposed development a gable roof, with a slope angle of 30° to 45°, the height of the roof ridge from 8.5 m to 10.5 m. The direction of the main roof ridge in relation to the front of the plot is specified in the graphic annex to the decision.
Public road access - the project site has access to a public municipal road (par. No. 171) via an internal road (parcel No. 199/1O).
Existing or designed land development - is sufficient for the construction project: supply of the designed building with electricity will be made from the existing connection to the power grid, supply of water from the designed individual water intake, ultimately from the water supply network, sewage will be discharged to the designed non-liquid waste tank with a capacity of up to 1O m3, ultimately to the sewage network, supply of heat from an individual heat source.
There is a possibility to buy additional plots of land giving a total area of 18264 m2.
The owner applied for a Pnb of a single-family building with a detached garage.
Zapraszam na prezentację.
Jeśli masz pytania dzwoń, pisz.
Pracuję 7 dni w tygodniu.